Instruction Before Starting The Pump
 


BEFORE STARTING THE PUMP

 
  • ENSURE THAT THE  PUMP  IS FREE WHILE ROTATING BY HAND.
 
  • ENSURE PERFECT ALIGNMENT .
 
  • ENSURE BEARING LUBRICATION.
 
  • ENSURE CIRCULATION OF COOLING WATER IN BRG. JACKET & PUMP BASE .
 
  • ENSURE API PLANS PROVIDED PROPERLY.
 
  • IF RECOMMENDED, ENSURE STEAM CIRCULATION IN STUFFING BOX  JACKET & QUENCH CONNECTION OF GLAND PLATE (PLAN 62) THE STEAM PRESSURE SHOULD NOT EXCEED 0.5 KG /CM2.
 
  • ENSURE PROPER DIRECTION OF ROTATING FOR MOTOR BEFORE COUPLING.
 
  • ENSURE FLOODED SUCTION TO AVOID DRY RUNNING OF SEAL.


DURING RUNNING CONDITION

 
  • ENSURE PROPER QUENCHING, IF RECOMMENDED.
 
  • ENSURE THAT THER IS NO CAVITATION / DRY RUNNING.
 
  • ENSURE THAT THE PUMP VIBRATIONS ARE WITHIN LIMIT.
 
  • ENSURE API  PLANS FUNCTIONING PROPERLY.
 